Connecting the urban landscape

The Urban Kerb system lowers the cost and time to deploy ev chargers substantially.  Accelerate your ev charger rollout!

From 2035 the sale of new petrol and diesel cars will be banned across the UK

To support this change  the government has a target of 300k charge points by 2030.  Most local authorities are well behind this target and need a cost effective way to increase the speed of their rollout while lowering the cost of the project.

Progress so far...

Pace of Growth
Too Slow

The UK has a legal commitment to achieving net-zero emissions by the year 2050

Funding
Underutilised

Funding exists but remains underused due to slow infrastructure deployment and logistical challenges

Current Method
Slow & Costly

Current methods to provide adequate EV infrastructure to meet targets are slow and costly

Total number of public electric vehicle charging devices installed in the uk (as of 1st January 2026)

0

Why Urban Kerb?

No Repeat
Excavation

Once Urban Kerb is installed it eliminates re-excavation for EV charger expansion

Reduced
Labour Costs

Faster, more efficient installations mean reduced labour costs

Zero
Material Waste

Urban Kerb will not crack, spall or chip resulting in additional savings on replacements

Health
and Safety

Reduced manual handling risks gives health and safety savings

Savings of circa £500 - £1000 can be achieved with every 10 meters of installation using Urban Kerb over existing methods